May 30, 1988

Report, Embassy of Hungary in North Korea to the Hungarian Foreign Ministry

The 22nd session of the Soviet-Korean Intergovernmental Economic, Technical, and Scientific [Consultative] Commission took place in Pyongyang from April 25 to May 3. The large group of Soviet experts arrived in the Korean capital a week before, while the head of the Soviet commission, First Deputy Premier V. S. Murakhovsky, the chairman of Agroprom, arrived on April 25. Kim Il Sung also received the delegation. […]


At the meetings of the commission, [the participants] concentrated on the important questions, while the details were dealt with by the various subcommittees. The Korean side placed particular emphasis on the construction of the nuclear power plant, pressing that production by its first block should start by the end of the third Seven-Year Plan (1993). The Soviet side pointed out that the selection of the site was still in progress, for which the Korean side was to blame. The observation of international geological norms and safety requirements must be the sole standard; the Soviet side cannot depart from these! Thus, the protocol recorded that there was a difference of opinion between the two sides.
Nor was an agreement reached on the second stage of the reconstruction of the steel-works in Cheongjin. In the view of the Soviet side, the doubling of the present annual capacity of 1.2 million metric tons was not realistic for the time being, and, in spite of the Korean request, [the Soviet side] did not undertake to deliver the equipment this year.


[…]


The Soviet evaluation [of the talks] is that so far this was the most realistic session of the commission. [The North Koreans] avoided political stock phrases and concentrated on those issues that were actually realizable. They abandoned their previous principle, according to which the protocol had to record the unanimous opinion of both sides. The principle of mutuality prevailed to a substantially greater extent than before. Both sides were well prepared for the negotiations.

Ferenc Rátkai
chargé d'affaires

Negotiations continue at the Soviet-Korean Intergovernmental Economic, Technical, and Scientific Commission on the construction of a nuclear power plant in North Korea. No agreement is reached on selecting a construction site.

Author(s):


Document Information

Source

MOL, XIX-J-1-k Korea, 1988, 58. doboz, 81-5, 5654/1988. Obtained and translated for NKIDP by Balazs Szalontai

Rights

The History and Public Policy Program welcomes reuse of Digital Archive materials for research and educational purposes. Some documents may be subject to copyright, which is retained by the rights holders in accordance with US and international copyright laws. When possible, rights holders have been contacted for permission to reproduce their materials.

To enquire about this document's rights status or request permission for commercial use, please contact the History and Public Policy Program at [email protected].

Original Uploaded Date

2011-11-20

Type

Report

Language

Record ID

110144